A lighting head and a monitor burning in a dark room, the rest of the bench in shadow
Elevator 4 · inventory as of 1 October 2026

The rig

Four bodies, six lenses, ninety-two kilowatts of light and a tower you can drop forty kilos down. Every plate below is the number we have actually measured in this hall, not the number on the box.

Specify a shoot
Bench 2 at 23:10 during the Window 11 light test · 14 August 2025 · photograph by Rzepecka

Every body carries a plate, and every plate says what the thing will not do

ARC-9 / 0117
187 000 fps

ARC-9 high-speed head

Will not: run above 54 000 fps on battery, hold focus past 38 °C, or record anything at all while the fan is off — and the fan is off for every take with sound.

Full height
11 400 fps at 2048 × 1536
Maximum
187 000 fps at 256 × 128
Shutter
1.1 µs to 1/60 s · 11° at 5 000 fps
Memory
72 GB · 11.4 s at 11 000 fps
ARC-4 / 0062
54 000 fps

ARC-4 second unit

Will not: trigger off the same piezo as the ARC-9 without a 40 µs offset. We learned that twice.

Full height
5 200 fps at 1920 × 1080
Maximum
54 000 fps at 512 × 288
Shutter
2 µs to 1/50 s
Memory
36 GB · 9.1 s at 5 200 fps
KL-2 / 0408
960 fps

KL-2 witness camera

Will not: be the hero camera, however much nicer the wide shot looks in the edit.

Rate
960 fps at 1920 × 1080, continuous
Purpose
Wide, locked off, runs all day for the client cut
Storage
2.1 TB per shoot day, handed over the same evening
Timecode
Jam-synced to the ARC-9 at every reload
TH-60 / 0019
1 000 fps

TH-60 thermal unit

Will not: see through glass, which surprises a client about once a quarter.

Rate
1 000 fps at 640 × 512
Sensitivity
60 mK · calibrated −20 °C to 650 °C
Used for
Friction heating at the crack tip, brake tests, weld spatter
Add-on
2 600 zł a day, booked with a body not instead of one
Glass
  • 100 mm macro T2.8 — the one that shoots porcelain
  • 180 mm T3.5 — for anything behind the blast shield
  • 24–70 mm T2.9 — the witness zoom, never the hero
  • 8 mm probe T5.6 — 240 mm rigid, goes inside the box
Light
  • 4 × 18 kW flicker-free continuous heads
  • 6 × 1200 W daylight units for the fill
  • 92 kW total draw, 400 A three-phase at the hall
  • One 100 kVA generator on a trailer for location days
Impact
  • 6.2 m drop tower, 40 kg carriage, magnetic release
  • Pneumatic impactor, 0–78 m/s, 12 mm steel ball
  • 12-tonne hand press for the slow failures
  • 2.4 m polycarbonate blast box, 25 mm walls
Plate 02release solenoid 24 Vcarriage 40 kgdrop 6.2 m11.0 m/s at the anvilblast box 2.4 m, 25 mmground anvil18 kW head18 kW head6 200 mm

Drop tower, elevation

We built it in 2021 out of two lengths of lift guide rail salvaged from the grain elevator the hall used to be. The carriage is held by a 24 V solenoid, which means the release is silent and repeatable to about four milliseconds — close enough that the pre-trigger always catches it.

Six point two metres gives eleven metres a second at the anvil, which is enough to break anything domestic and not quite enough to break a 300 mm concrete cube. For the cube we use the press and a great deal of patience.

The rails came out of the elevator's own lift shaft and still carry the grease marks of sixty years of grain hoists. We kept them because they were already plumb to within two millimetres over six metres, which is better than anything we could have bolted up ourselves.

11.0m/s at the anvil
± 4ms release repeatability
2.4m polycarbonate box

Questions we get on the phone

Rig notes
06
Do you hire the cameras out on their own?

No. The ARC-9 goes out with one of us attached to it. Half the value of a high-speed day is somebody who already knows what 11° of shutter costs you in light, and the other half is somebody who can tell you in the first hour that the shot you planned will not work.

Can you come to our lab instead?

Yes, and about a third of our days are location days. We need a 400 A three-phase supply or room for the trailer generator, a floor that will take 1.4 tonnes, and somewhere dark enough to kill the daylight. Travel outside Zachodniopomorskie is 2.40 zł a kilometre plus 220 zł a day each.

Why does the light cost more than the camera?

Because every doubling of the frame rate halves the exposure. Going from 5 000 to 54 000 frames a second with the same shutter angle costs you eleven times the light, and the only honest way to find it is more kilowatts. That is why the hall sounds like a wind tunnel on a fast day: it is all fans.

How long until we see something?

Witness footage the same evening on a drive. Graded hero takes in six working days, or three for a 35 % rush. We do not send dailies by link because a 72 GB take over a hotel connection is nobody's idea of a good evening.

Can we watch from inside the hall?

Two people, behind the yellow line, in the goggles we hand you, with ear defenders on for anything above the press. Everybody else watches the witness feed from the mezzanine, which is honestly the better seat.

What will you not put in the box?

Live animals, firearms, pressurised vessels we have not had certified, and anything that will not fit inside the 2.4 metre box. The box is the limit on the whole business, and we would rather lose the job than shoot something outside it.

The boring half

Ninety-two kilowatts, and somebody has to carry it

High-speed work is sold on the camera and delivered on the electricity. A fast day at Elevator 4 pulls 92 kW across four heads, which is roughly forty domestic kettles running for nine hours, and every one of those cables has to be run, taped, numbered and coiled again by the two of us before we go home.

We put this on the site because it is the part clients do not budget for. If your building cannot give us 400 A we bring the trailer, and the trailer is 1 400 zł a day with fuel.

What a day costs
A technician in a helmet with ear defenders and clear goggles, lit from the sideByk on the mezzanine during the Forty Tonnes press run · 9 October 2025 · photograph by Rzepecka
A worker in a yellow hard hat beside heavy machinery in a tall industrial hall

Tell us what has to break and we will tell you the rate

We answer every docket in two working days, including the ones we turn down
Open a docket →